Methodologies
Under Development
Proposed new and revisions to existing methodologies, modules, and tools must undergo Verra’s Methodology Development and Review Process (MDRP). The MDRP includes a public stakeholder consultation and a comprehensive review process including by a group of independent experts to ensure technical rigor, consistency, and alignment with VCS Program rules. During this process, the methodology, tool, or module may be approved, put on hold, or rejected.
At the core of Verra’s mission is empowering project developers with resources for advancing effective, scalable solutions that mitigate the impacts of climate change.
You develop the projects; we develop methodologies that enable the design and implementation of projects that drive climate impact and improve people’s wellbeing.
Verra is looking for funders, technical contributors (paid consultants or those willing to offer in-kind support), and independent expert reviewers to support the development of methodologies in the VCS Program. Your support helps accelerate the publication and development of these methodologies that the world urgently needs.
Contact methodologies@verra.org and indicate the specific Methodology Development ID# and type/level of interest to support our work.
- Methodology Idea Note: The initial proposal for the development of a new methodology has been submitted and is either under review or awaiting review. Verra does not guarantee that a MIN proceeds to the next stage, full development, and final approval.
- Concept Note: The detailed scope and key methodological components of a proposed new methodology or revision of an existing one are under development. Verra does not guarantee that a concept note proceeds to the next stage, full development, and final approval.
- Draft Methodology: A complete draft of the proposed methodology, module, or tool is prepared in preparation for the public consultation. Verra does not guarantee that a draft methodology proceeds to the next stage, full development, and final approval.
- Public Stakeholder Consultation: Verra provides a draft of the methodology, module, or tool for public comment review and is collecting feedback. Verra does not guarantee that the draft methodology, module or tool proceeds to the next stage, full development, and final approval.
- Independent Expert Review: A group of independent experts is reviewing the methodology, module or tool. Verra does not guarantee they proceed to the next stage, their full development, and final approval.
- VVB Assessment: A validation/verification body group is assessing the methodology, module or tool. (Applies to methodologies under development following the Methodology Development and Review Process, v4.4 (PDF)).
- Final Review and Decision: Verra is reviewing the proposed methodology, module, or tool and determines whether or not it will be approved.
- On hold: The development of the proposed methodology, module, or tool is paused and may be resumed later.
- Rejected: Verra has determined not to proceed with the development of the proposed methodology, module, or tool.
- Archived: The proposed methodology, module, or tool has been merged with another similar proposal or is not proceeding as originally proposed for another reason.
Below is a list of methodologies, tools, and modules that are under development, along with their respective statuses.
Search:
CN0157
5. VVB Assessment
Methodology for Grid-Connected Energy Storage Systems
CN0154
3. Draft Methodology Development
Methodology for Engineered Carbonation of Mineral Waste
CN0151
7. On Hold
Methodology Framework for Carbon Capture, Utilization, and Storage
CN0144
7. On Hold
Methodology for Aircraft Contrail Management
CN0142
7. On Hold
Methodology for Reducing Cattle Methane Emissions Through Direct Reduction of Exhaled Methane
CN0137
5. VVB Assessment
Tool for quantifying organic carbon stocks using digital soil mapping: calibration, validation, and uncertainty estimation
CN0135
3. Draft Methodology Development
Methodology Framework for Emissions Reductions and Increased Carbon Sequestration Through Traditional Savanna Fire Management
CN0133
7. On Hold
Revision to VT0005: Tool for Measuring Aboveground Live Forest Biomass using Remote Sensing, v1.0
CN0128
7. On Hold
Revision to VM0043: Methodology for CO2 Utilization in Concrete Production, v1.0
CN0126
3. Draft Methodology Development