Methodologies
Under Development
Before a methodology, tool, or module becomes active, it must go through Verra’s Methodology Development and Review Process (MDRP). This process applies to the creation of a new methodology, tool, or module and the revision of a methodology, tool, or module that already exists. The MDRP includes rigorous expert reviews and public stakeholder consultations to ensure integrity and alignment with the VCS Program. During this process, the methodology, tool, or module may be approved, put on hold, or rejected.
Below is a list of methodologies, tools, and modules that are under development, along with their respective statuses.
Search:
M0284
9. Archived
Revision to AM0073: Multi-site manure collection and treatment in a central plant
M0281
7. On Hold
Methodology for Arctic Ice Thickening
M0280
4. Open for Public Consultation
Minor Revision to AMS-III.BM.: Lightweight Two and Three Wheeled Personal Transportation
M0279
3. Draft Methodology Development
Revision to VM0032 Methodology for the Adoption of Sustainable Grasslands through Adjustment of Fire and Grazing, v1.0
M0274
3. Draft Methodology Development
Methodology for Improved Forest Management Using Dynamic Randomized In-Project Control Baseline with External Benchmarking Safeguard
M0273
6. Final Verra Review
Revision to VM0047 Afforestation, Reforestation, and Revegetation, v1.0
M0272
2. Concept Note
Module for Avoiding Planned Deforestation Activities
M0269
8. Rejected
Methodology for Emission Reduction from Production of Low Carbon Content Fossil Fuels
M0265
7. On Hold
Methodology for Microbial Carbon Mineralization (MCM)
M0264
3. Draft Methodology Development