Methodologies
Under Development
Proposed new and revisions to existing methodologies, modules, and tools must undergo Verra’s Methodology Development and Review Process (MDRP). The MDRP includes a public stakeholder consultation and a comprehensive review process including by a group of independent experts to ensure technical rigor, consistency, and alignment with VCS Program rules. During this process, the methodology, tool, or module may be approved, put on hold, or rejected.
At the core of Verra’s mission is empowering project developers with resources for advancing effective, scalable solutions that mitigate the impacts of climate change.
You develop the projects; we develop methodologies that enable the design and implementation of projects that drive climate impact and improve people’s wellbeing.
Verra is looking for funders, technical contributors (paid consultants or those willing to offer in-kind support), and independent expert reviewers to support the development of methodologies in the VCS Program. Your support helps accelerate the publication and development of these methodologies that the world urgently needs.
Contact methodologies@verra.org and indicate the specific Methodology Development ID# and type/level of interest to support our work.
- Methodology Idea Note: The initial proposal for the development of a new methodology has been submitted and is either under review or awaiting review. Verra does not guarantee that a MIN proceeds to the next stage, full development, and final approval.
- Concept Note: The detailed scope and key methodological components of a proposed new methodology or revision of an existing one are under development. Verra does not guarantee that a concept note proceeds to the next stage, full development, and final approval.
- Draft Methodology: A complete draft of the proposed methodology, module, or tool is prepared in preparation for the public consultation. Verra does not guarantee that a draft methodology proceeds to the next stage, full development, and final approval.
- Public Stakeholder Consultation: Verra provides a draft of the methodology, module, or tool for public comment review and is collecting feedback. Verra does not guarantee that the draft methodology, module or tool proceeds to the next stage, full development, and final approval.
- Independent Expert Review: A group of independent experts is reviewing the methodology, module or tool. Verra does not guarantee they proceed to the next stage, their full development, and final approval.
- VVB Assessment: A validation/verification body group is assessing the methodology, module or tool. (Applies to methodologies under development following the Methodology Development and Review Process, v4.4 (PDF)).
- Final Review and Decision: Verra is reviewing the proposed methodology, module, or tool and determines whether or not it will be approved.
- On hold: The development of the proposed methodology, module, or tool is paused and may be resumed later.
- Rejected: Verra has determined not to proceed with the development of the proposed methodology, module, or tool.
- Archived: The proposed methodology, module, or tool has been merged with another similar proposal or is not proceeding as originally proposed for another reason.
Below is a list of methodologies, tools, and modules that are under development, along with their respective statuses.
Search:
M0377
7. On Hold
Methodology for the avoidance of methane from cattle manure storage through the use of manure storage additives
M0376
7. On Hold
Revison to AM0009, Recovery and utilization of gas from oil fields that would otherwise be flared or vented
M0375
8. Rejected
Methodology For Transport Emissions Reductions Through Behaviour Change
M0374
8. Rejected
Methodology for utilizing co-products from the human food supply chain in combination with animal manure management systems to reduce GHG on livestock farms
M0373
7. On Hold
Module for CO2 Capture from Combustion-based Industrial Heat and Power Generation
M0371
8. Rejected
Revision to ACM0014 Treatment of Wastewater: Methodology for Vinasse Waste Management – Biogas and Ferti-irrigation Application
M0370
3. Draft Methodology Development
Revision to AMS-III.Y to Include Use of Organic Bedding Material
M0369
8. Rejected
Methane Reduction through Algal Bloom Mitigation in Aquatic Ecosystems
M0368
6. Final Verra Review
Minor revision to VM0045 Methodology for Improved Forest Management Using Dynamic Matched Baselines from National Forest Inventories, v1.1
M0333
4. Open for Public Consultation