Methodologies
Under Development
Proposed new and revisions to existing methodologies, modules, and tools must undergo Verra’s Methodology Development and Review Process (MDRP). The MDRP includes a public stakeholder consultation and a comprehensive review process including by a group of independent experts to ensure technical rigor, consistency, and alignment with VCS Program rules. During this process, the methodology, tool, or module may be approved, put on hold, or rejected.
At the core of Verra’s mission is empowering project developers with resources for advancing effective, scalable solutions that mitigate the impacts of climate change.
You develop the projects; we develop methodologies that enable the design and implementation of projects that drive climate impact and improve people’s wellbeing.
Verra is looking for funders, technical contributors (paid consultants or those willing to offer in-kind support), and independent expert reviewers to support the development of methodologies in the VCS Program. Your support helps accelerate the publication and development of these methodologies that the world urgently needs.
Contact methodologies@verra.org and indicate the specific Methodology Development ID# and type/level of interest to support our work.
- Methodology Idea Note: The initial proposal for the development of a new methodology has been submitted and is either under review or awaiting review. Verra does not guarantee that a MIN proceeds to the next stage, full development, and final approval.
- Concept Note: The detailed scope and key methodological components of a proposed new methodology or revision of an existing one are under development. Verra does not guarantee that a concept note proceeds to the next stage, full development, and final approval.
- Draft Methodology: A complete draft of the proposed methodology, module, or tool is prepared in preparation for the public consultation. Verra does not guarantee that a draft methodology proceeds to the next stage, full development, and final approval.
- Public Stakeholder Consultation: Verra provides a draft of the methodology, module, or tool for public comment review and is collecting feedback. Verra does not guarantee that the draft methodology, module or tool proceeds to the next stage, full development, and final approval.
- Independent Expert Review: A group of independent experts is reviewing the methodology, module or tool. Verra does not guarantee they proceed to the next stage, their full development, and final approval.
- VVB Assessment: A validation/verification body group is assessing the methodology, module or tool. (Applies to methodologies under development following the Methodology Development and Review Process, v4.4 (PDF)).
- Final Review and Decision: Verra is reviewing the proposed methodology, module, or tool and determines whether or not it will be approved.
- On hold: The development of the proposed methodology, module, or tool is paused and may be resumed later.
- Rejected: Verra has determined not to proceed with the development of the proposed methodology, module, or tool.
- Archived: The proposed methodology, module, or tool has been merged with another similar proposal or is not proceeding as originally proposed for another reason.
Below is a list of methodologies, tools, and modules that are under development, along with their respective statuses.
Search:
M0391
9. Archived
Proposed Revision to VM0049 Carbon Capture and Storage, v1.0
M0389
7. On Hold
Methodology for Reclaimed HFC refrigerant
M0388
9. Archived
Methodology for Energy Efficient, Heat Retention Cookers
M0387
2. Concept Note
Revision to VM0050 Energy Efficiency and Fuel-Switch Measures in Cookstoves
M0385
8. Rejected
Methodology for Artificial Fertile Soil Creation
M0384
7. On Hold
Revision to ACM0022 Alternative waste treatment processes
M0382
9. Archived
Revision to ACM0001 “Large-scale Consolidated Methodology Flaring or use of landfill gas” to encompass removals of emissions at too low a concentration to support flaring or combustion
M0380
9. Archived
Proposed minor revision to VM0045, v1.1
M0379
7. On Hold
Revision of CDM methodology ACM0019, N2O abatement from nitric acid production
M0378
8. Rejected