Methodologies
Under Development
Before a methodology, tool, or module becomes active, it must go through Verra’s Methodology Development and Review Process (MDRP). This process applies to the creation of a new methodology, tool, or module and the revision of a methodology, tool, or module that already exists. The MDRP includes rigorous expert reviews and public stakeholder consultations to ensure integrity and alignment with the VCS Program. During this process, the methodology, tool, or module may be approved, put on hold, or rejected.
Below is a list of methodologies, tools, and modules that are under development, along with their respective statuses.
Search:
M0206
9. Archived
Methodology for Black Soldier Fly Larvae Disposing of Organic Waste
M0205
8. Rejected
Methodology for Carbon-Aware Computing
M0204
8. Rejected
Methodology for On- and Off-Road Mobile Electric Vehicle and Equipment Charging
M0203
8. Rejected
Methodology for Supporting Watershed Protection Activities Avoiding Water Management Infrastructure Upgrade and Operations Emissions
M0202
8. Rejected
Revision to AM0086, Large-Scale Methodology: Distribution of low greenhouse gas emitting water purification systems for safe drinking water
M0200
9. Archived
Methodology for Production of Low-Carbon Cement and Concrete
M0199
7. On Hold
Module for VM0041: Methodology for the Reduction of Enteric Methane Emissions from Ruminants through the Use of Feed Ingredients
M0198
8. Rejected
Methodology for Production of Substitutes that Displace the Use of Peat in Growing Media
M0197
8. Rejected
Revision to AMS-III.BA, Small Scale Methodology: Recovery and recycling of materials from E-Waste
M0196
7. On Hold