Methodologies
Inactive Methodologies
Verra reviews active methodologies to ensure (1) that they continue to reflect best practices, scientific consensus, evolving market conditions, and ongoing technical developments, (2) that they are consistent with current VCS Program rules and requirements, and (3) use appropriate and current methodological procedures. These reviews are conducted at least every five years since a methodology’s last update or review.
As a result of a review, Verra may revise or inactivate a methodology. Verra may also inactivate a methodology where no projects using the methodology have been registered within five years of the last update or review.
When Verra inactivates a methodology, a grace period may be provided for projects that are using the methodology and that are under development or validation and will be specified on the methodology’s webpage. Project proponents may continue to apply an inactivated version of a methodology, module, or tool until their next crediting period renewal or baseline reassessment, provided the request for registration, crediting period renewal, or verification with baseline reassessment was submitted within the grace period.
Information on previous versions and their associated grace periods is available in the “Development History” section of the respective methodology’s webpage.
The list below contains all methodologies that are currently inactive. Unless otherwise specified, stakeholders may request reactivation of an inactive methodology by submitting a methodology idea note as per the VCS Methodology Development and Review Process (PDF).
Search:
AMS-III.BO.
Inactive Date:
September 11, 2023
AMS-III.BO. Trip avoidance through equipment improvement of freight transport
AMS-III.BP.
Inactive Date:
September 11, 2023
AMS-III.BP. Emission reduction by shore-side electricity supply system
AMS-III.BQ.
Inactive Date:
September 11, 2023
AMS-III.BQ. Hydrogen fuel cell vehicles
AMS-III.BS.
Inactive Date:
June 12, 2025
AMS-III.BS.: Application of dry-cultivated water-saving and drought-resistance rice in rice cultivation
AMS-III.C.
Inactive Date:
July 3, 2025
AMS-III.C. Emission reductions by electric and hybrid vehicles
AMS-III.J.
Inactive Date:
September 11, 2023
AMS-III.J. Avoidance of fossil fuel combustion for carbon dioxide production to be used as raw material for industrial processes
AMS-III.K.
Inactive Date:
September 11, 2023
AMS-III.K. Avoidance of methane release from charcoal production
AMS-III.L.
Inactive Date:
September 11, 2023
AMS-III.L. Avoidance of methane production from biomass decay through controlled pyrolysis
AMS-III.M.
Inactive Date:
September 11, 2023
AMS-III.M. Reduction in consumption of electricity by recovering soda from paper manufacturing process
AMS-III.N.
Inactive Date:
September 11, 2023