Ten additional methodologies active in Verra’s Verified Carbon Standard (VCS) Program have been digitalized through Verra’s integration with Hedera Guardian. This brings the total number of digitalized methodologies resulting from this collaboration to eleven. With these additions, Verra now has 34 digitalized methodologies across its programs.
The recently added methodologies are as follows:
- VM0042 Improved Agricultural Land Management, v2.1
- VM0045 Improved Forest Management, v1.2
- VM0047 Afforestation, Reforestation and Revegetation, v1.1
- VM0050 Energy Efficiency and Fuel-Switch Measures in Cookstoves, v1.0
- VM0051 Improved Management in Rice Production Systems, v1.0
- AMS-II.C.: Demand-side energy efficiency activities for specific technologies, v16.0
- AMS-III.C.: Emission reductions by electric and hybrid vehicles, v16.0
- AMS-III.F.: Avoidance of methane emissions through composting, v12.0
- AR-ACM0003: Afforestation and reforestation of lands except wetlands, v2.0
- ACM0022: Alternative waste treatment processes, v3.0
Previously, VM0033 Methodology for Tidal Wetland and Seagrass Restoration, v2.1 was published in digital format under this collaboration.
Verra plans to digitalize twelve additional methodologies through the Hedera Guardian collaboration in 2027. In addition, Verra expects to make updated versions of the above methodologies, where they exist, available digitally (e.g., VM0050, v1.1).
In 2025, Verra integrated Hedera Guardian, an open-source platform powering the digital economy, with the Verra Project Hub. This integration created a basis for digitalized Verra methodologies and associated project workflows to enhance the transparency, auditability, and integrity of methodologies and monitoring systems in carbon markets.
Two Pathways for Using Digitalized Methodologies
To provide flexibility to proponents seeking to register projects using digitalized methodologies in any Verra Program, Verra supports two pathways, with project review processes being centrally managed through the Verra Project Hub in either case:
- Verra Project Hub: Existing project hub users can work with the digitalized methodologies directly in the Verra Project Hub; an external account is not needed.
- Verra Guardian Portal (Managed Guardian Service): Organizations with a new or existing Managed Guardian Service (MGS) account can use the Verra Guardian Portal and link their account to the Verra Project Hub.
Through either pathway, project proponents and validation/verification bodies (VVBs) can prepare and submit digitalized project documentation, including project descriptions (PDs), monitoring reports (MRs), validation reports (ValRs), and verification reports (VerRs). Combined VCS+CCBS templates of version 4 of the VCS Program are also supported. Version 5 templates are under development.
Project proponents and validation/verification bodies (VVBs) interested in using these pathways can find prerequisites, access options, onboarding steps, and workflow guidance in the Guardian Onboarding Guide available in the Digital Resources/Documentation section of the Verra Project Hub.
As the use of these digitalized methodologies expands, Verra will continue to gather feedback from project proponents, VVBs, and other stakeholders to inform future digital releases and Verra’s broader approach to digitally enabled project documentation, validation, verification, and review.