This is a minor revision to the VM0052 methodology and VMD0060 which together, determine net greenhouse gas (GHG) emission reductions resulting from the accelerated retirement of grid-connected coal-fired power plants (CFPPs) paired with the addition of renewable electricity to partially or fully replace the lost electricity capacity.
Project proponents must use this methodology in conjunction with VMD0061 Just Transition Requirements for Accelerated Retirement of Coal-fired Power Plants to ensure that projects are accompanied by a comprehensive just transition plan and implementation. The just transition mitigates negative impacts of accelerated retirement of CFPPs such as loss of livelihoods of workers, their households, contractors, and communities.
Summary of Development
- Verra hosted a public consultation from March 27, 2026 to April 26, 2026.
- The revision is currently at “Step 6: Final Verra Review and Decision” of the VCS Methodology Development and Review Process (PDF).
Announcements
This page and its content are subject to the Verra Website Terms and Conditions of Use and constitute “Website Materials” as therein defined. Use is permitted only for the establishment or operation of a project or the development of a methodology under a Verra certification program. All other uses are prohibited.