8. Rejected
6. Construction
M0483
The proposed methodology applies to retrofit project activities in existing buildings and aims to reduce greenhouse gas (GHG) emissions through improvements in operational energy performance and reductions in embodied carbon associated with construction materials. Project activities include energy efficiency measures implemented during building operation and material substitution measures applied during renovation works.
Summary of Development
- On October 12, 2026, the development of this methodology was rejected per the VCS Methodology Development and Review Process (PDF). After careful review, Verra determined that the proposal’s climate impact was not as high as that of other ideas. Verra will therefore not proceed this approach to the full methodology development process at this time.
This page and its content are subject to the Verra Website Terms and Conditions of Use and constitute “Website Materials” as therein defined. Use is permitted only for the establishment or operation of a project or the development of a methodology under a Verra certification program. All other uses are prohibited.