Status

Inactive

Active Date

30 September 2025

Verra has inactivated the CDM TOOL32 under the VCS Program. Verra may include simplified procedures to demonstrate additionality into revised VCS methodologies.

Please Note:

  • Projects using TOOL32 v4.0 in combination with ACM0001 Flaring or use of landfill gas, v19.0 or AMS-III.G. Landfill methane recovery, v10.0 must have been listed as “under validation” on the Verra Registry by 21 November 2025 and must submit a registration request by 31 May 2026.
  • All other new projects using TOOL32 v4.0 must have concluded validation and submitted a registration request by 30 September 2025.
  • The C&C issued on 18 March 2025 has been updated on 21 November 2025 following Verra’s review of TOOL32. See the Clarification to TOOL32 (PDF).