This module provides guidance on stratifying the project area into discrete, relatively homogeneous units to improve accuracy and precision of carbon stock and carbon stock change estimates.
- New projects and projects that did not initiate the public comment period (i.e., that did not request pipeline listing under validation) before November 27, 2023, have until February 27, 2024, to do so using the previous versions of the methodology.
- Project proponents that have initiated or will initiate a public comment period before February 27, 2024, have until February 27, 2025, to complete validation with previous versions of the methodologies. If they complete validation by then, projects may continue to use these methodologies until they have to transition to the new REDD methodology or until their next baseline reassessment or crediting period renewal, whichever is the earliest.
- Projects validated with previous versions may continue to use these methodologies until they have to transition to the next methodology or until their next baseline reassessment or crediting period renewal, whichever is the earliest.
Development History
VMD0016 Methods for stratification of the project area (X-STR), v1.3 (PDF)
Status: Active since 27 November 2023
Summary of Changes:
- Update to the latest VCS methodology template
- Removal of references to VM0007
Developer: Verra
Dates of Public Consultation: N/A
Summary of Public Consultation: N/A
VVB Assessment Report: N/A
VMD0016 Methods for stratification of the project area (X-STR), v1.2 (PDF)
Status: Active since 8 September 2020
Summary of Changes: The module was updated to include activities on tidal wetlands.
Developer: Restore America’s Estuaries and Silvestrum Climate Associates
Dates of Public Consultation: N/A
Summary of Public Consultation: N/A
VVB Assessment Report: N/A
VMD0016 Methods for stratification of the project area (X-STR), v1.1 (PDF)
Status: Active from 9 March 2015 to 8 September 2020
Summary of Changes: The module was updated to include activities on peatlands.
Developer: Permian Global, Silvestrum and Greifswald University
Dates of Public Consultation: N/A
Summary of Public Consultation: N/A
VVB Assessment Report: N/A
VMD0016 Methods for stratification of the project area (X-STR), v1.0 (PDF)
Status: Active from 3 December 2010 to 9 March 2015
Developer: Avoided Deforestation Partners
Dates of Public Consultation: 18 May 2009 to 16 June 2009
Summary of Public Consultation: N/A
VVB Assessment Report: VM0007, v1.0 First Assessment Report (PDF), VM0007, v1.0 Second Assessment Report (PDF)